Wednesday, January 11, 2012

Home Projects Delay Layout Start, But...

As they say in a favorite Classic Rock song..."One thing leads to another..." And thus it is with the "last" major upgrade project in our "new" 1920's-vintage home. The project to get rid of gawd-awful wall texture and purple paint by scraping and re-mudding the walls, has now lead to pulling out the toilet, sink and now the floor and sagging sub floor. So, with that said, getting some modeling in, in my spare "spare time" has been a luxury. I apologise for focusing on my HO-to-On30 locomotive conversion project for so many posts, but that's about the only wheel turning on my railroad of late.
Progress does soldier-on and at last the little engine is starting to look like a backwoods logging (or sugar plantation) saddle tank steamer. I have begun to apply those rivet decals I purchased from Micro Mark. They go on very easily with the standard decal solutions and decal application methods and look pretty good so far. I'm holding out complete giddiness until the model is painted!
I've begun scratch-building the loco's cab, doing the construction with an O-scale ruler and eye-balling it to see if the "look" is right. I also decided to test fit the saddle tank assembly on the loco's HO 2-8-0 chassis to see how the proportions looked and I think they are going to be fine. As you know, I'm not following any specific prototype locomotive for the build, but I am basing the "look" of the locomotive on images of Hawaiian sugar plantation saddle tankers and a couple of similar loco models I found pictures of on the Internet. As I've stated in early posts, the whole idea behind the Swamp Logger On30 layout and concept was to be creative, have fun and not get bogged down with details, rivet counting or painfully trying to recreate an exact replica of any prototype railroad or railroad equipment. It's all "imagineered," to paraphrase Walt Disney!
In the top of the page image, I have the loco sitting on a cabinet in our "craft room/hobby room" on HO flex track. There are plenty of details yet to be added and the under-construction cab is simply perched on the 'business end' of the frame. The widened auxiliary tender also is en-route to more finishing work and completion of the DCC sound system hook-up. But all-in-all, the little engine is coming along nicely and looks pretty darn good, I'd say. It has given me a much-needed diversion from the home improvement projects that seem to refuse to get completed.

Again, any comments are greatly welcomed! Thanks for reading!

Thursday, December 29, 2011

Getting Back To Modeling

Time sure flies by when the holidays are upon a person! Here it is, just about at the end of the month and end of the year and I'm now just getting back to doing some modeling at the work bench. I've been working hard to get our new old house in ship-shape after the move-in...building, painting most of the rooms, doing minor repairs, hanging mini blinds, etc., plus getting ready for Christmas!
So, what's been happening? Well, here's a quick run-down.
The biggest surprise was receiving the January 2012 issue of Model Railroader Magazine and seeing a 7-page feature article and photos of my HO-scale Big Island Rail layout in living color! Wow! I was brought to tears as I held the magazine in my hands realizing a life-long dream to have a layout feature in MR! Please check it out when you have a chance.

My wife and I were able to sneak in a quick side trip to a hobby/train shop in St. Paul during a Christmas visit to family last weekend, so I tried to stock-up on parts and a few scratch building supply items. Ouch! Expensive! Spending money was not as easy as I thought, since this shop did not have much 1/4-inch (O-scale) or On30 detail parts. I did purchase a set of On30 arch bar trucks for the tender of my HO-to-On30 Bachmann 2-8-0 saddle tank conversion project. With a little modification, I now have the appropriate size trucks under the tender and it now has that cool "look" to it. Hopefully the power pick-up wipers will "work" and I'll be able to keep the stock set up with those. I rearranged the DCC components inside the tender to allow more room for the sound system and speaker, so that better. I still have to solder the two power leads from the sound module to the DCC board.
Before Christmas, I had the steam and sand domes and a water fill hatch cemented to the top of the saddle tank, but realized I didn't leave enough room for the bell, a steam power generator or water fill hatch. (Ooops!) So, luckily I was able to pop those details off and reposition them better. The photo above shows the new arrangement with space for the bell between the taller steam dome and the sand dome. Not being a "Steam" guy I'm kinda prodding around in the dark with this locomotive. I do have a lot of great photos of plantation-style saddle tank locomotives in the Hawaiian Railroads book, plus a few downloaded from Internet searching, so I'm using those as my guide. The nice thing about NOT following any specific prototype is I can develop and create this locomotive as I go. As long as it looks like it would "work" in the real world, I suppose that's all that's needed. There were so many variations of equipment and shop repairs and rebuilds to these old steamers, that I would think anything goes!
To place the domes on the saddle tank top, I used the "discarded" section of PVC pipe as a sanding guide to shape the bottoms of the domes to fit the curve of the tank. Works pretty well, as seem in this image, above. If you are wondering what "part" I've used for the steam dome, it's actual an antique of the film camera days. In the old 110mm pocket camera film cassettes were these geared spools that the film wrapped around. Back in the days when I worked at One-Hour photo labs, I snagged a handful of these spools, thinking at the time they might be cool for logging "junk." Well, I spotted the reel in the parts bin and bingo - steam dome. I removed the geared top and replace it with an O-scale lamp shade. On top of this will go the steam whistle.

I couldn't find a O-scale steam generator detail part at the hobby shop so I when off to my scrape parts bins to find stuff to scratch-build a reasonable representation of one. Using what looks to be some type of HO-scale barrel, along with a HO-scale locomotive brake system component, I fashioned a steam generator taking my cue from several photos. All I need to add is an exhaust tube, bent to follow the contours for the loco's stack, and get the unit mounted on top of the saddle tank right behind the stack. You can see the detail part in the upper photo showing the saddle tank. The part is sitting on the work mat in the upper right hand corner by the sanding stick.
One of the coolest things I have purchased for this project are the rivet decals available from Micro-Mark. For the $12 you get two large sheets of the raised rivets in curves and strips, plus louvers and a few other details that I wish I had when I was building my Diesel swamp logging critter! So before I get too far along with add items to the saddle tank, I will next add some of these rivets to the tank. I'll let you know how they work!

Well, that's 'bout all for now. As soon as the final home projects are wrapped-up, I'll head to the basement to get that area prepped for rebuilding my double scale, double deck layouts! Then the real fun begins! Thanks for reading and following this blog, Tell your modeling friends about it. Please feel free to leave a comment!

Wednesday, November 30, 2011

Progress. Slow, But None-the-Less Progress


With projects around our new digs, I've spent only a few moments at the workbench with my On30 steam locomotive project. But I have been able to make slow and steady progress on converting a Bachmann 2-8-0 HO scale loco into an cool-looking On30 narrow gauge logging 'woods' engine for my future On30 Blackwater & Mosquito Creek Lumber Company "Swamp Logger" layout.
For a quick run-down of the project so far, please check out my previous blog postings. Here's what's been happening in the past week or so. This, belive it or not (seen above), my friends, is the new "saddle tank" for the new woods steam engine. The discarded piece of PVC pipe was cut just off center with my power miter saw, then cut to length.
In this view, above, 'mounting planks' are cemented to the trimmed pipe. These styrene pieces will help the new saddle tank attach effortlessly to the stripped-down HO scale boiler and serve as front end platforms for the engine's walkways, as seen in the photo below.

The tank sits on the boiler on the HO walkways which were left on the model (not seen in this view) and just clears the smokestack opening. You can see I have cut piece of flat styrene to fit as the front section of the tank. I have since trimmed and sanded this to match the curvature of the tank. Here's how it will look on the locomotive boiler, below.
The running gear and motor housing just squeezes, and I mean SQUEEZES, up into the boiler with nearly zero-clearance. So, it will be interesting to route the headlight wires to the front of the smoke box! I will next test fit the steam and sand domes to the top of the tank. I am still trying to decide if I will use the small HO scale ones I pulled of the boiler or make something from the scrap pile. I will use a section of the same PVC pipe with sandpaper attached, to form the proper curve to the bottom mounting areas. OK, I know, I could have shelled out $20 and bought them in 1/4-inch scale, but what fun is that?

I also need to fashion and new exhaust stack and mount a smoke arrestor on top. I'm eyeing an old plastic ink pen on my work table that seems to have just the right taper and diameter to it. Hmmmm.
The new cab will mount to the rear of the new saddle tank and extend towards to back of the engine with the cab roof overlapping the tender slightly.

The O scale rivet decals I ordered from Micro Mark arrived today in the mail. I can't wait to see how these look on the new saddle tank and the tender. So - as I wait for the UPS guy to bring me the other O-scale detail parts I ordered, like the bell, handrail stanchions, headlight, etc. - if you don't mind, I have a cab to scratch build!

Comments are always welcome! Thanks for taking the time to read my blog posts!

Wednesday, November 16, 2011

Back To Scratchbuilding, For A Moment

(Announcer) "When we last left our newly moved model railroader, (me) his layout was in sections piled-up in his new, smaller basement and the pre-snow-outside house -projects "Honey-Do"list was growing by the minute...."

Well. I'm happy to report the outside projects are done, so let the snow fly...so far the weather has been sunny and cool - go figure! The inside projects list is getting addressed with caulk, Spackle and paint. In the spare moments of the day (ha) I have had a chance to work on my On30 2-8-0 logging locomotive conversion from HO scale. (See previous posts for background info.) I have had the forethought to actually document the process with photos so if I ever get around to putting together another "how-to" article for a modeling magazine, I'll have the "beginning construction" shots done.
To update the project, I have completed the locomotive's tender to the point of doing final gap-filling, detailing, testing the DCC and finally painting. I started by building an extended frame around and over the HO locomotive tender chassis using styrene strips, so the new 1/4-inch-scale width tender frame measured-out to about 7.5 feet. I'm still toying with the idea of replacing the small HO trucks with a set of On30 trucks and then somehow adapting them to pickup power from the rails like the HO ones do. In the meantime, the HO scale trucks will do just fine.
With razor saw in hand, the tender body was cut in half and all the un-needed plastic was cut, filed and sanded away. I cemented the sides to the new extended frame. The "stock" loco's wiring and DCC plug-in can be seen as well. Now, the fill in the gaps.
Above you can see a filler section bridging the gap between to two original rear tender sides. I also cut and added sand bins from an old Shay tender to this section to add interest and take the eye away from the gap. I did the same gap filling in front, but with more pieces to create a "walkway" over the mini plug that connects the loco wiring to the tender. (See other photo below) Once this stage in the construction was done, I tested the DCC and sound components into the enlarged tender body to see how everything would fit.
In the background of the above picture, you can see the tender's top deck section. This was built to be removable to access the DCC system. I cut a section of the old HO tender's top and water hatch and glued that to the new tender deck, as well as adding a fuel oil hatch. I want to get some of those Micro-Mark rivet decals to add details to the new tender and locomotive. Has anyone used them yet?
I'm going to have to mount a coupler pocket to the rear, but I guess I'll wait on that until I decide on the taller On30 trucks or not. The tender will get an operating rear headlight, as well as coupler lift bars, grab irons, steps and all the other detail goodies to bring it to life.
This tender has given me an opportunity to get my feet wet in the new scratch building project. Now onto the actual locomotive with the saddle tank, new cab, walkways and all the other doo-dads. I guess that means a trip to the on-line hobby shop!

Wednesday, October 19, 2011

Modifying A Concept

Pardon me as I hop-scotch back to the HO layout this time, as this seems to be the way my mind is working lately as I ponder the new twin scale stacked layouts.

With the impending Minnesota winter weather looming just around the corner, my efforts have been to complete outside projects at our new home before the snow flies. So modeling has been confined to working on the On30 steam saddle tanker conversion and keeping the pencils worn-down as I work and rework plans for the new layouts.

My latest thoughts for the upper-level Hawaiian-theme modern HO scale shortline railroad is to downplay the Big Island Rail concept and play up more of the gritty industrial sugar company railroading concept. In my former layout, the Puna Sugar Company sugar mill complex never was built. In it's old supporting role,  the mill's bulk sugar and sugar cane unit trains had trackage rights over the BIRR to the 'mill' from the cane fields and from the mill to the Hilo Harbor area with bulk raw sugar for transfer to ocean-going ships. Other than that, a mill switcher would have shuttled cars around the mill.

In this new concept, the BIRR takes on the supporting role and the PSCX takes center stage. With a much smaller layout area to build in, I'm trying to develop a plan that will offer a lot of operation possibilities as well as my desired continuous running loop.  One of the features of the HO layout will be a compact Puna Sugar processing mill (built over the workbench in the basement) where fresh-cut sugar cane is brought in - with unit cane trains (using my cool see-through cane cars home-built from retired boxcars - a la U.S. Sugar in Florida) - to the dump for crushing. Bulk sugar is loaded in covered hopper cars and back hauled to the BIRR interchange for shipment to the Bulk Sugar Transfer Facility at Hilo Bay (which may be located on a long spur to the back of the staging yard over the washer and dryer in the basement.)

With my current track plan for the HO layout, the sugar mill would be reached via the diamond at "Sugar Jct." where the track squeezes passes through beside the AC/Heater unit. The mill will, as stated earlier, have a cane dump track, as well as the bulk sugar loader. If there is room, bagasse loader and molasses pipe spurs will be worked into the mill facility. PSCX transfer runs will connect the mill with the BIRR interchange in Hilo over branchline rails. Cane trains will run from staging to the mill via "Sugar Jct." A mill switcher will work trackage.

Big Island Rail crews will have some work to do as well on the branchline with a possible ethanol plant (or maybe a HELCO power plant or intermodal ramp), plus the Hawaiian Fruit Exchange cold storage spur and maybe a spur into Hilo Auto Recycling to switch in the "Sugar Jct." industrial district. BIRR will offer "Live Interchange" working the South Hilo interchange tracks to set out cars bound for Puna Sugar and hauling outbound cars to the BIRR Hilo yard (staging) or the C and H / Puna Sugar Bulk Sugar Transfer.

All this and continuous running to boot!

Thanks for reading! Leave a comment if you'd like!

Friday, October 14, 2011

The Sketching Continues

As we work on all the projects that need to be done on our recently purchased home before winter hits our corner of Minnesota, the basement home of the future On30 and HO layouts is basically a storage room for the old HO layout sections, boxes of rolling stock and structures and a lot of bins with parts, tools and other model railroading junk.

I have started to tinker on my conversion project to make a On30 Logging steam engine from a HO scale Bachmann 2-8-0 loco. After totally taking the loco apart, (above) I have started rebuilding the tender, widening the frame and cutting the tender body apart in half lengthwise in order to widen it to a scale 7 1/2-feet. That is the progress report on the loco conversion for now.

Of course the pen and paper sketching continues on the proposed On30 and HO layouts. Following a session with a tape measure noting basement dimensions with a bit more 'reality' than I had before, I have been able to get a better idea of what will fit in the new space.

Not to exact scale, these track sketches are more accurate than my earlier efforts.

Here is my latest effort to design the On30 Swamp Logger layout. The space is roughly 11 x 10.5 feet. The track that exits the layout area between the wall and the AC/Heater will head to a small staging yard over the work bench in another part of the basement.

As I've noted in previous posts, the logging layout will be the lower of the two layouts in the space. I'm looking at building this layout at about 44-inches above the floor.

Below is the proposed Big Island Rail/Puna Sugar Co. HO scale layout that will be mounted above the On30 bench work. Despite what the drawing shows, this layout will hover at about 64 to 66 inches above the floor.

The track that leaves the layout area at "Sugar Jct." between the AC unit and the wall will head to the Puna Sugar Co complex, to be above the work bench in the basement.

Comments are always welcome. Thanks for reading and following this blog.

Friday, October 7, 2011

More Inspiration

While packing books for the move, I rediscovered a fine hard cover logging book about the Caspar Lumber Company railroad called "Mallets On The Mendocino Coast." I forgot how cool this logging operation along the rugged Northern California coastline was! The standard gauge rail operations lasted into the late 1940's with an array of steam locomotives including a small shay, a Climax, a few small tank engines and two massive articulated Mallets with tenders.



Thumbing through the book provided additional inspiration for my planned On30 coastal "Swamp Logger." The Caspar had a fleet of compact coastal steam freighters that hauled rough-cut redwood to the San Francisco Bay Area docks. With my planned harbor trackage, I would love to build one of these steamships and tie it up at the Pier One complex.


I've also found a few photos of narrow gauge steam engines to base my HO-to-On30 2-8-0 tank engine project on. A couple nice shots showing all the piping, domes and cab structure as well as the tender to tag onto the tail end of my new logging engine. As much as I'd like to say I can fab all the parts for my steam engine conversion, but I will have to make a trip to the hobby shop, which is a couple hour drive from where I live. Of course I can order parts over the Internet, as well. What's on the parts list? Lots of details typical for the classic steam loco - 1/4-inch scale back head details, piping, whistle, bell, headlight casting among other goodies. I also need to mount a pair of On30 trucks under the loco's tender which will be widened and contain the power pickups, DCC decoder and sound system components as mentioned in my last posting.

Thanks to the Internet, researching logging photos and history is relatively simple and provides lots of inspiration for these types of projects. Yet, I'm an analog guy in a digital world, and like to have a piece of paper, magazine or book in my hands. One of the other inspirations I garnered from the Caspar book was how woods crews switched out loads and empties using a wye and a single run-around track at the interchange between the woods and the run to "town.". What's cool about this is I had planned a similar track arrangement for my On30 logging layout. Reading about how they used the woods switcher to help the woods road engine set out and exchange loads for MTs and be in the clear to head back with the MT's to the log landings and have the loads ready for pick-up for the trip to the mill was very interesting. This insight helps reinforce how to operate my On30 models in a prototypical way.