Showing posts with label logging. Show all posts
Showing posts with label logging. Show all posts

Monday, September 26, 2011

All Moved In. Now, the "Work" Begins

Well, it seemed like the day would never get here and now it's in the history books. The move into a new home has happened and sections of my HO layout, plus dozens of boxes filled with locos, freight cars, structures, track and details have been transferred and fill the new, smaller basement where they will be reconfigured and reside for many years to come.

Now that my wife and I are actually in the house and the trains are in the basement, I will be able to get a more accurate idea of how feasible my plan to have a double deck, two-scale, two-theme layout room really is. Just from seeing the space without the previous owners "stuff" in there I'm feeling pretty good about being able to make the concept work. Funny how a long-time model railroader can look at a future layout space and visualize how a layout will work within the confines of the walls, furnace, water heater, washer and dryer, posts, piping, vents and all the other stuff in the way!

So, until I can get down there into the future basement train room and start up-grading the space to be move "layout-friendly" I'll still be plugging along with my HO-to-On30 2-8-0 logging tank engine conversion project at the workbench when not working at the other homeowner projects to get the other parts of the new house up to snuff. Hmmm... Looks like I'll try to put my multi-tasking skills to use...painting the master bathroom and framing in a new wall for the layout room, tearing out a old deck and sealing the basement walls. I'll keep you posted on how things are going!

Thanks for reading these blog posts. Please tell your model railroading friends to check-in every once in a while. Please become a follower of the blog as well. Drop me a comment, as they are very nice to receive and I love the feed back and ideas!

Friday, September 16, 2011

On30 Layout Revisited and Logging Critter Update

I'm getting anxious to get started with the new layout(s). My goal is to take the "limited" layout space and make the best of it for both my HO scale Big Island Rail layout and the new On30 Logging/Harbor pike.I think the concentrated space will help me centralize layout plans and keep me in check. In my Colorado bedroom HO layout (before the move to Minn.) I was able to zero-in on the limited space and get the layout  "close to completion." Good enough to take some great photos and get a layout feature accepted by Model Railroader Magazine (not yet published). I'm hopeful I can accomplish the same with my combo layouts concept.

I'm thinking of using the top HO scale layout as a valance, so-to-speak, for the On30 layout below. I want the room to look beautiful, finished, comfortable and a joy to spend time it. Since this is going to be a "permanent" layout(s) working on room finishes and lighting will be a must. I plan to finish the front fascia of the layouts in a nice "bead board" paneling, painted in a nice "Depot" green and trimmed to add a touch of class to the finished layout room. I want a seamless, curved background panel as well. Lighting the On30 layout will come mostly from fixtures under the HO layout bench work with additional lights in the room to highlight extended section of the On30 layout.

Pondering a Change of Theme 
The more I ponder my new On30 project during the countdown to a new basement, I'm starting to think about dropping the whole "Sugar Plantation"  railroad concept and unifying the layout into an "All Swamp Logging and Lumber" railroad. I've modified my operations concept to have logging trains run through from staging wing through the woods camp and then into "town/harbor" and off to the other staging wing to the "mill." This will add more actual running of the trains along the layout.

With this idea, my thought is to use the Pier 1 portion of the layout as a tidewater harbor. Instead of handling mainly bagged raw sugar, I would run lumber cars from the "mill" to the Pier 1 area for loading onto cargo steam ships for travel to market. General freight shipments will also head to the harbor to keep the local trains busy.

I think this is a better concept for the layout so I can keep the backwater Bayou feel to the entire layout giving better continuity and purpose and not dividing the small layout into two even smaller parts. I can still use my On30 scratch-built sugar boxcars as lumber company supply cars between mill and woods. I will run passenger trains or mixed trains to the harbor and rail bus operations from harbor to the woods camps for added interest and operations.

Critter Nears Completion
Interspersed in this blog dispatch are the latest snapshots of my scratch-built On30 critter. Still to do - run the lights into the headlight housings, add some "steps" at all four corners, add 'No. 6' to the cab sides, weather the loco a bit more, add a bell and more detail parts and goodies in the cab and on the engine itself. When funds allow, I'll purchase a small speaker that will squeeze into the short hood and a sound unit for the DCC.

Thursday, September 1, 2011

Layout Height, Part 2

With a new layout on the drawing board...well, actually TWO new layouts in the planning stages, figuring out  track height is going to be a critical aspect of planning. My one limiting factor of the "lower-level" On30 layout in the new basement was a planned staging yard "wing" I envisioned over the laundry area of the basement on a narrow shelf. I have planned the same type staging yard wing for the HO "upper-level" layout where height will not be an issue at 65-inches above the floor. I measured our washer and dryer and they stand at just shy of 48-inches (4 feet) with the dryer sitting on a foot-tall platform adding to that height. That measures-out to be taller than my estimated On30 layout height of about 46-to-48-inches from the floor. Doing some quick math, this leaves about a foot and a half between bench work of the HO layout and rails of the On30 layout. Hmmm? Is this enough space between the two pikes?

Since the HO layout will be mostly narrow shelves above the On30 layout, it might not be as much of a concern as I think it might be. If I lower the On30 layout to say...40-inches...that will give me about 2-feet between the two layouts, better separation so the On30 layout wouldn't seem so "squashed" and wedged into too small of a space. But, with the On30 layout that low, I would run into issues in the laundry area staging getting it over the washer and dryer.

After pondering this, I have come up with an idea. Since I plan on building a new wall to separate the layout room from the rest of the basement and the laundry area, I could wrap a gentle curve through the new wall and mount the staging yard and turntable along the outside of the wall. Since I would like to include a turntable in the staging yard to spin steam locomotives for return trips into the main layout room, the wider shelf would work better along the new wall rather than over the washer and dryer area. With this plan, I would add a backdrop and scenery to the staging yard since it will be a predominate scene in the basement. This will give "visitors" a glimpse of what awaits behind the walls.

With that said, I could place the layout height at whatever I feel is comfortable for working and running trains. I'm still thinking about having the On30 layout operable from a rolling stool or tall office chair. That will make spending time in the train room more comfortable and enjoyable. Now, I need to start shopping for chairs or shop stools with a tape measure in hand to find one at the right height. Then I can zero-in on the final height to build the On30 layout bench work when I get to that phase of the new layout construction.

Monday, August 29, 2011

Critter Progress Update

Well, with all the other stuff going on I have been able to spend a few minutes at the work table this past week. Progress continues, albeit slowly, with my critter.


Using the Atlas HO scale S-1 power chassis, I've been spending some enjoyable hours scratch building the super structure for what will be a On30 logging switcher or possibly, with my newly developing layout scheme, the Pier 1 harbor docks switcher.

I don't claim to be an expert scratch builder and this little guy, although a far cry better than attempts at loco conversions from years past, will never pull in a blue ribbon at the modeling contest. But it's not being build to win contests. It's being built to operate and convey the hardscrabble life that early gas-mechanical and Diesel locomotive had in industrial settings. I would never attempt to scratch build a loco in HO scale for my Big Island Rail. Creating a cool, funky 'critter' for a imagined railroad. So far it's been a very fulfilling project and a test of my building and problem solving skills, for sure. Plus, the big challenge is building an locomotive with very few commercially produced, store-bought parts. There isn't a hobby (model train) shop anywhere to be found for miles. And with a very limited budget for trains right now, I've been searching my parts and junk drawers for everything and anything that would work on this engine.

As much as I'd love to spend a hundred bucks on this rebuild with all the "right" detail parts, etc., I'm almost imagineering a proper locomotive with shapes, forms and a few on-hand parts to convey that feeling described above. I have borrowed (scavenged) a few HO scale parts for the project, including air tanks and a pair of SP style barrel headlights which look right on scale with this loco. Everything else is styrene sheet stock and shapes ( "L" angle "I" beams, etc.).

For the loco "crew" I am re-purposing a 1/48-scale (?) Germany Army military seated figure for the engineer. I mean how many logging Hogheads carry side arms? Well, I'm actually going to have a rifle in the cab...just never know when you might encounter a big 'gator sunning itself on the tracks! The brakeman will be a commercially available O-scale figure left over from my On3 modeling days. He'll be leaning back against the cab bulkhead.

With the open cab of this critter, I had to build a three-sided box over the chassis to hide the motor and DCC stuff. It looks OK but does cut down on the spaciousness of the cab's interior. The cab has received a first coat of industrial green that looks pretty good and will hide some of the "flaws." I plan to add a lot of details parts to the interior, like the rifle, oil cans, chain, water jug and tools to help pull the eye to those items and not so much to the big motor box inside. Plus on a logging loco, the more clutter the better, right?

There won't be any "glass" in the window frames of the cab, since in the hot and humid environs of the swamp, the more air circulation the better. I might add some "screen" material to the openings and a tarp or two to help keep the rain out.

I'm installing the handrails now for the side walkways and the front and rear platforms and hand grabs for the cab. So far it's looks pretty good. I've also added some "nut/bolt/washer" details to the frame and pilots, some angle stock to the engine access doors for hinges and an exhaust stack from scrap and a hood air intake (winterization hatch) from one of my HO scale Diesels.

I'm itching to get it finished so I can get a coat of paint on the body. Not sure yet what color...yellow? Maybe orange-reddish? Something that kinda stands out in a realistic way...and certainly not black.

Then all that's has to be done is lengthen the headlight wire s to mount them in the headlight castings, (maybe put a light in the cab?) and install a sound unit and speaker (still scratching my head on how to get that speaker in the cab roof) and my On30 logging/Harbor switcher is ready for revenue service on my new layout!